4/9: Concrete Floors Poured!

We had a great week! Our focus is to get all the concrete floors poured as soon as possible. This week we poured the last slab under the West stadia, poured the slab under the East stadia, the North end of the West rink, and the resurfacer room along with two sets of stairs! As far as the other trades are concerned, we are sheetrocking in the Convention center ( The Tapers will be here on Monday!) Our underground rough in’s are 95% done. With all the rain this week, we were still able to install a Curtain wall under the shelter and installed the glass on the South end of the building. Block layers are under the West stadia laying up locker room walls and we continue to install above grade Mechanical/Electrical piping. We will start site work next week!